Projects

Home / Projects

MCC & RMU (2024)

Installation MCC &RMU 22/6.6 kv for motor 1200kw

- AGHS Conveyors Dust Suppresstion Sysyem – Electrical Components - AGHS Dumping Area Dust Suppresstion Sysyem – Mechanical ...

EGAT Project (2021)

Relocate Conveyor System at EGAT Maemoh

Solar Pv System Helps Reduce Power Consumption. Solar Roof Converts Free Renewable Resources Into Electricity And Has ...

Build New Office Container Hiatachi Machinery Size: 3x12x2.6 m

Renovation House and Project

- Prefabricated House Used Container - Construction Project and Renovation House Apartment

Hongsa Power Company (2020)

- Cable Plug control & power , Wire Pull cord, Limit switch & Take up wind in cable tray - Install Cable tray for Take up wind, ...

Control cabinet installation work Automatic air conditioner Electricity Generating Authority of Thailand (Northeast)

Set up alingment forconveyor drive unit 1750 kw

EGAT Project‎ (2019)

Light cabinet Supply and Installation of Field Devices and Safety Devices of Power Electricity Generating Authority of Thailand

Electric house relocate at Lao

Fabricate for Pontoon TSS Total 100 ton for Project Maemoh

MRD-ECC Project (2019)

Installation and making of a microcontroller System Project MRD-ECC At Lampang Thailand

- Make lagging of Pulley for Hongsa power company and ITD-SQ JV 2017 - Supply and Installation Lighting for west line 2 ...

- Supply Manpower and Material for Erection Electrical equipment - Commissioning and Test Conveyor system at Sahakol PCL ...