Hongsa Power Company (2019)
Electric house relocate at Lao
Welcome to S.W.P. Intertrade Limited Partnership 
งานของบริษัท S.W.P.
Electric house relocate at Lao
Fabricate for Pontoon TSS Total 100 ton for Project Maemoh
Installation and making of a microcontroller System Project MRD-ECC At Lampang Thailand
– Make lagging of Pulley for Hongsa power company and ITD-SQ JV 2017
– Supply and Installation Lighting for west line 2 …
– Supply Manpower and Material for Erection Electrical equipment
– Commissioning and Test Conveyor system at Sahakol PCL …
Supply and Installation air conditioner wall type Carrier 18,000 BTU quantity 120 set
Supply and Installation conveyor equipment BW1000 mm., BW800 mm. total 500 mm.
Annual inspection for electrical system service by professional electrical engineer team who have the experience on this field about 15 years.
Annual electrical system inspection. Install auto power factor 160 KVA 2 Unit
Overhaul Gearbox MMD sizer 4 Unit